SPR Projects

SouthPine Railroad - (Routes)

Try Our New Dark Mode

^

SouthPine Railroad Projects – Overview

While I do not consider myself to be an accomplished route builder in “Trainz”, when I first started my journey in this simulator and discovered surveyor, like many other creators I had a vision of creating that one massive route that would be as prototypical as I or anyone could possibly imagine. Those who have been in the community for a while may remember a creator called Paul Haglund (fishlipsatwork), Paul was well known for creating DEM terrain maps and I decided to stitch some together to make the basis of my “Ultimate” route, I actually think from memory that I may have joined four (4) of his DEM maps together.

With just a little more experience it became very evident that the size of this route was far beyond my capabilities, I think it would be almost impossible for a group of route builders to complete. I did however manage to populate the complete length of the route with dual track running the complete length on a trip that takes almost 7 hours real time to complete.

That said I do enjoy route building and getting to set up sessions in such a way that trains can run in a relatively prototypical manner under AI conditions, and of course I am an asset creator as well and having routes that I am building that can double as test beds for my assets just makes sense to me. So below you will find a list of the current routes I am working on, I will also be providing more detailed separate pages for each route.

Current Route List

SouthPine Valley 1.2.1.0

Layout Size:

36 Base boards 12×3

Layout Basis:

The SouthPine Valley series of routes is based on the original TRS2004 route “Highland Valley” created by Chuck (CeeBee) Barkman

Completion Level:

80% – This route is being updated and re-released and currently has one (1) available session

  • Release 85% 85%
  • Terrain 100% 100%
  • Trackwork 100% 100%
  • Texturing 100% 100%
  • Trees and Vegetation 50% 50%

SouthPine Valley 2.0.1.0

Layout Size:

179 Base boards 25×7 + 4 boards

Layout Basis:

The SouthPine Valley series of routes is based on the original TRS2004 route “Highland Valley” created by Chuck (CeeBee) Barkman

Completion Level:

75% – This routes release scheduled is currently unknown,  but it will have four (4) available sessions.

  • Release 90% 90%
  • Terrain 100% 100%
  • Trackwork 90% 90%
  • Texturing 95% 95%
  • Trees and Vegetation 75% 75%

SouthPine Valley 3.0.1.0

Layout Size:

686 Base boards 49×14

Layout Basis:

The SouthPine Valley series of routes is based on the original TRS2004 route “Highland Valley” created by Chuck (CeeBee) Barkman

Completion Level:

25% – This route is not currently scheduled for release before late 2025.

  • Release 25% 25%
  • Terrain 100% 100%
  • Trackwork 0% 0%
  • Texturing 0% 0%
  • Trees and Vegetation 0% 0%

SouthPine River

Layout Size:

140 Base Boards

Layout Basis:

The SouthPine River route is based heavily on the original TRS2004 route “Robe River Iron” created by Bruce Kennewell (3801), with a large amount of modification and some major additions.

Completion Level:

85% – This route is no longer scheduled for release due to changes with many of the BTC assets.

  • Release 85% 85%
  • Terrain 100% 100%
  • Trackwork 90% 90%
  • Texturing 100% 100%
  • Trees and Vegetation 50% 50%

SouthPine Granger

Layout Size:

Base board count coming……

Layout Basis:

The SouthPine Granger route is based heavily on the original 2004 route “Watseka & Kankakee Railroad” created by George Fisher (gfisher)

Completion Level:

55% – This route is currently not scheduled for release. After importing the route into TRS22 there were some errors caused by the number of trackmarks I had used. Until I find the solution to these errors I will not consider releasing the route.

  • Terrain 100% 100%
  • Trackwork 90% 90%
  • Texturing 40% 40%
  • Trees and Vegetation 10% 10%

SouthPine Hump Yard Stage 1

Layout Size:

25 Base Boards (Module)

Layout Basis:

The SouthPine Hump Yard Stage 1 is a freelanced route that is designed to be used as a module for a larger route. The hump yard itself has an 84 track bowl that actually works as 2 x 42 track separate yards, with two feeder tracks pushing rolling stock over two individual humps.

Completion Level:

85% – This route is currently not scheduled for release, when it is released it will probably only have one (1) available session.

  • Terrain 100% 100%
  • Trackwork 90% 90%
  • Texturing 100% 100%
  • Trees and Vegetation 50% 50%

SouthPine Railroad FV-2.0.1.0

Layout Size:

Way to many base boards to count.

Layout Basis:

Those who have been in the community for a while may remember a creator called Paul Haglund (fishlipsatwork), Paul was well known for creating DEM terrain maps and I decided to stitch some together to make the basis of my “Ultimate” route, I actually think from memory that I may have joined four (4) of his DEM maps together.

Completion Level:

35% – This route is currently not scheduled for release.

  • Terrain 90% 90%
  • Trackwork 75% 75%
  • Texturing 5% 5%
  • Trees and Vegetation 5% 5%
  • Industries 10% 10%